Collier County GPS Coordinates for Fishing

State: Florida

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. A GPX file download is provided at the bottom of the page if you'd like to import all the locations. Note that they may also include locations from nearby areas. into your GPS. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location.

If you have any feedback, or want to suggest any additional sites, please feel free to Contact Us.

Waypoint Map

Waypoint Name Description Latitude Longitude
Amt Reef About 400 Large (3 Ft) Pieces Of Concrete Rubble Three Drops Also 11
Depth (in feet): 45
Relief (in feet): 10
Date of Deployment: November 23 2004
Primary Material: CONCRETE RUBBLE (400)
Tonnage: 1800
County: COLLIER [1]
Tides & Solunars
25° 54' 36" N
(25.91012)
81° 59' 5" W
(-81.9848)
Caxambas Pass 14 Miles Reef 360 Tons Of Concrete Culverts (Not Located 12/01).
Depth (in feet): 46
Relief (in feet): 0
Date of Deployment: May 18 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 360
County: COLLIER [1]
Tides & Solunars
25° 47' 31" N
(25.792)
81° 57' 15" W
(-81.95408)
Caxambas Pass 2.5 Mile 180 Tons Pipe And 160 Tons Pilings 20K Sq. Ft 1 Of 2 Loads (Not Foun
Depth (in feet): 24
Relief (in feet): 0
Date of Deployment: May 22 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 340
County: COLLIER [1]
Tides & Solunars
25° 55' 48" N
(25.93)
81° 46' 0" W
(-81.76667)
Caxambas Pass 2.5 Mile 170 Tons Of Pilings 2Nd Of Two Loads (Not Found 12/01)
Depth (in feet): 24
Relief (in feet): 0
Date of Deployment: May 28 1997
Primary Material: CONCRETE PILINGS
Tonnage: 170
County: COLLIER [1]
Tides & Solunars
25° 55' 55" N
(25.932)
81° 45' 12" W
(-81.75333)
Caxambas Pass 5.0 Mile Marco 5 Mile 1972 Concrete And Pipe (Not Located 12/01)
Depth (in feet): 30
Relief (in feet): 0
Date of Deployment: December 31 1972
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 47" N
(25.86313)
81° 47' 40" W
(-81.7944)
Clam Pass 3 Mile - 03 Concrete Manhole Risers And Covers ,20000 Funded By City Of Naples And C
Depth (in feet): 25
Relief (in feet): 8
Date of Deployment: May 31 2001
Primary Material: CONCRETE MANHOLE RISERS (28)
Tonnage: 358.5
County: COLLIER [1]
Tides & Solunars
26° 13' 35" N
(26.22647)
81° 52' 13" W
(-81.8702)
Clam Pass 3 Mile - Pile 1800 Concrete Railroad Ties 8’X12X10
Depth (in feet): 26
Relief (in feet): 11
Date of Deployment: June 1 2001
Primary Material: CONCRETE RAILROAD TIES (1800)
Tonnage: 591.7
County: COLLIER [1]
Tides & Solunars
26° 13' 34" N
(26.2262)
81° 52' 4" W
(-81.8679)
Clam Pass 3 Mile -01 Six Feet Across Concrete Slabs And Pilings (1 Of 2 Deployments)
Depth (in feet): 25
Relief (in feet): 8
Date of Deployment: May 14 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 345.8
County: COLLIER [1]
Tides & Solunars
26° 13' 34" N
(26.2262)
81° 52' 4" W
(-81.8679)
Clam Pass 3 Mile -02 Six Feet Across Concrete Slabs Pilings And Cutoffs (2 Of 2 Deploymen
Depth (in feet): 25
Relief (in feet): 8
Date of Deployment: May 22 2000
Primary Material: CONCRETE RUBBLE (100)
Tonnage: 392.6
County: COLLIER [1]
Tides & Solunars
26° 13' 23" N
(26.22317)
81° 52' 3" W
(-81.86752)
Clam Pass 3 Mile -C And D Rubble And Pilings County Funded ,25695
Depth (in feet): 0
Relief (in feet): 0
Date of Deployment: September 26 2003
Primary Material: CONCRETE RUBBLE (500)
Tonnage: 571
County: COLLIER [1]
Tides & Solunars
26° 13' 27" N
(26.22408)
81° 52' 14" W
(-81.87048)
Collier 5 Mile Reef 1000 Yards Of Concrete Pilings (Curbs) 2Nd Of 3 Loads This Grant
Depth (in feet): 31
Relief (in feet): 6
Date of Deployment: November 4 1980
Primary Material: CONCRETE PILINGS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 20" N
(25.85552)
81° 47' 37" W
(-81.7935)
Collier 5 Mile Reef 800 Yards Of Concrete Pilings (Curbs) Confirmed By Rbf Grant Fwcc-01
Depth (in feet): 31
Relief (in feet): 3
Date of Deployment: November 8 1980
Primary Material: CONCRETE PILINGS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 50" N
(25.86377)
81° 47' 38" W
(-81.79388)
Collier 5 Mile Reef 72X32x6 Ft Barge And 512Yds Of Pilings Confirmed By Rbf Grant Fwcc-0
Depth (in feet): 31
Relief (in feet): 6
Date of Deployment: October 29 1980
Primary Material: BARGE STEEL 72’
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 54" N
(25.86493)
81° 47' 47" W
(-81.79647)
Doc Kline Lincolin Logs 2 Piles Of Pilings(36 Total) At 30’ X 1’ X 1’
Depth (in feet): 30
Relief (in feet): 8
Date of Deployment: September 5 2000
Primary Material: CONCRETE PILINGS
Tonnage: 0
County: LEE [1]
Tides & Solunars
26° 20' 21" N
(26.33915)
82° 5' 24" W
(-82.08987)
Doctor's Pass 5 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Depth (in feet): 34
Relief (in feet): 4
Date of Deployment: May 27 1994
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER [1]
Tides & Solunars
26° 10' 13" N
(26.17025)
81° 54' 22" W
(-81.90625)
E-F (Jaycees) Reef 310 Tons Of Concrete Culverts.
Depth (in feet): 31
Relief (in feet): 8
Date of Deployment: June 30 1992
Primary Material: CONCRETE CULVERTS
Tonnage: 310
County: LEE [1]
Tides & Solunars
26° 20' 5" N
(26.33463)
82° 5' 21" W
(-82.08913)
E-F (Jaycees) Reef 225 Tons Of Concrete Culverts.
Depth (in feet): 31
Relief (in feet): 8
Date of Deployment: June 7 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 225
County: LEE [1]
Tides & Solunars
26° 20' 9" N
(26.3358)
82° 5' 21" W
(-82.0892)
E-F (Jaycees) Reef 300 Tons Of Precast Concrete.
Depth (in feet): 31
Relief (in feet): 8
Date of Deployment: June 30 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 300
County: LEE [1]
Tides & Solunars
26° 20' 9" N
(26.33582)
82° 5' 33" W
(-82.0926)
Eca Reef Concrete Rubble And Steel I Beams ,10000 Funded By Eca
Depth (in feet): 24
Relief (in feet): 10
Date of Deployment: May 24 2001
Primary Material: CONCRETE RUBBLE (200)
Tonnage: 319.1
County: COLLIER [1]
Tides & Solunars
26° 18' 22" N
(26.30615)
81° 52' 21" W
(-81.87257)
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Depth (in feet): 32
Relief (in feet): 12
Date of Deployment: May 26 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE [1]
Tides & Solunars
26° 20' 17" N
(26.33803)
82° 5' 7" W
(-82.08535)
Evan Thompson Reef Units 20’X20’x12’h Lincoln Log Structure 50 Pilings
Depth (in feet): 32
Relief (in feet): 12
Date of Deployment: May 25 2000
Primary Material: CONCRETE MODULE LINCOLN LOGS
Tonnage: 144
County: LEE [1]
Tides & Solunars
26° 20' 17" N
(26.33803)
82° 5' 7" W
(-82.08535)
Evan Thompson Reef Units Five 7’ X 7’ Slabs With Two Culverts Each
Depth (in feet): 32
Relief (in feet): 12
Date of Deployment: May 27 2000
Primary Material: CONCRETE CULVERTS (10)
Tonnage: 0
County: LEE [1]
Tides & Solunars
26° 20' 17" N
(26.33803)
82° 5' 7" W
(-82.08535)
G-H Reef 110’ Steel Barge-35’ Steel Tugboat-Steel Dumpsters.
Depth (in feet): 30
Relief (in feet): 0
Date of Deployment: August 1 1984
Primary Material: BARGE STEEL
Tonnage: 0
County: LEE [1]
Tides & Solunars
26° 20' 35" N
(26.34318)
81° 57' 14" W
(-81.95398)
G-H Reef Limestone Added To Previous Materials.
Depth (in feet): 28
Relief (in feet): 6
Date of Deployment: May 7 1994
Primary Material: ROCK LIMESTONE
Tonnage: 510
County: LEE [1]
Tides & Solunars
26° 20' 39" N
(26.34427)
81° 57' 31" W
(-81.95863)
G-H Reef 8 Concrete And Screen Juvenile Habitats Large Diameter Vertical
Depth (in feet): 27
Relief (in feet): 8
Date of Deployment: December 14 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: LEE [1]
Tides & Solunars
26° 20' 40" N
(26.3445)
81° 56' 42" W
(-81.94497)
G-H Reef Concrete Culverts 4.5 Miles From Big Carlos Pass
Depth (in feet): 28
Relief (in feet): 0
Date of Deployment: May 24 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 450
County: LEE [1]
Tides & Solunars
26° 20' 45" N
(26.34572)
81° 57' 11" W
(-81.95317)
Gordon Pass 14 Mile Reef 1993 800 Tons Concrete Culvert And Rubble (Not Located 12/01)
Depth (in feet): 42
Relief (in feet): 0
Date of Deployment: December 31 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 14' 11" N
(26.2365)
82° 7' 35" W
(-82.12632)
Gordon Pass 5 Mile 1 Barge Of Square Shaped Power Poles Hollow Inside (Not Found 12/01)
Depth (in feet): 26
Relief (in feet): 3
Date of Deployment: June 5 1996
Primary Material: CONCRETE PILINGS
Tonnage: 680
County: COLLIER [1]
Tides & Solunars
26° 5' 9" N
(26.08583)
81° 53' 20" W
(-81.88888)
Gordon Pass 5 Mile Reef Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Depth (in feet): 28
Relief (in feet): 3
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 4' 52" N
(26.08117)
81° 53' 9" W
(-81.88573)
Gordon Pass 5 Mile Reef Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Depth (in feet): 28
Relief (in feet): 3
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 4' 53" N
(26.08147)
81° 53' 8" W
(-81.88552)
Gordon Pass 5 Mile Reef Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Depth (in feet): 28
Relief (in feet): 3
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 4' 54" N
(26.08155)
81° 53' 8" W
(-81.88543)
Gordon Pass 5 Mile Reef Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Depth (in feet): 28
Relief (in feet): 3
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 4' 54" N
(26.08155)
81° 53' 8" W
(-81.88543)
Gordon Pass 5 Mile Reef Concrete Culverts And Rubble Over Large Area Confirmed By Rbf Grant Fw
Depth (in feet): 28
Relief (in feet): 3
Date of Deployment: July 22 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 4' 54" N
(26.08165)
81° 53' 7" W
(-81.8854)
Gordon Pass 5 Mile Reef Dc3 Fuselage And Concrete Culverts (Not Located 12/01)
Depth (in feet): 25
Relief (in feet): 0
Date of Deployment: December 7 1987
Primary Material: AIRPLANE DC3
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 5' 26" N
(26.09057)
81° 53' 42" W
(-81.89497)
Gordon Pass 5 Mile Reef Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Depth (in feet): 35
Relief (in feet): 4
Date of Deployment: March 1 1993
Primary Material: STEEL RECTANGULAR TANKS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 5' 47" N
(26.09628)
81° 53' 21" W
(-81.88903)
Gordon Pass 5 Mile Reef Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 35
Relief (in feet): 5
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 5' 47" N
(26.09637)
81° 53' 20" W
(-81.88897)
Gordon Pass 5 Mile Reef Gordon Pass 5 Mile From Sfara 5/98 Confirmed By Rbf Grant Fwcc-0100
Depth (in feet): 35
Relief (in feet): 4
Date of Deployment: March 1 1993
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 5' 48" N
(26.09657)
81° 53' 19" W
(-81.88867)
Gordon Pass 5 Mile Reef Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 35
Relief (in feet): 5
Date of Deployment:
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 5' 48" N
(26.09673)
81° 53' 18" W
(-81.88837)
Gordon Pass 9 Mile 92 Concrete Modules Set In Six Rows From North To South.
Depth (in feet): 23
Relief (in feet): 0
Date of Deployment: June 29 1992
Primary Material: MODULES CONCRETE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 3' 46" N
(26.06283)
81° 59' 21" W
(-81.98917)
Keewaydin 3 Mile #1 Limestone Boulders -#1 Of 4 Patch Reefs This Day/Grant
Depth (in feet): 27
Relief (in feet): 8
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER [1]
Tides & Solunars
26° 2' 2" N
(26.0339)
81° 49' 47" W
(-81.82978)
Keewaydin 3 Mile #2 Limestone Boulders -#2 Of 4 Patch Reefs This Day/Grant
Depth (in feet): 27
Relief (in feet): 9
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER [1]
Tides & Solunars
26° 2' 7" N
(26.03515)
81° 49' 51" W
(-81.83087)
Keewaydin 3 Mile #3 Limestone Boulders -#3 Of 4 Patch Reefs This Day/Grant
Depth (in feet): 27
Relief (in feet): 12
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER [1]
Tides & Solunars
26° 2' 10" N
(26.03615)
81° 49' 54" W
(-81.83165)
Keewaydin 3 Mile #4 Limestone Boulders -#4 Of 4 Patch Reefs This Day/Grant
Depth (in feet): 27
Relief (in feet): 11
Date of Deployment: June 6 2002
Primary Material: ROCK LIMESTONE BOULDERS
Tonnage: 147.9
County: COLLIER [1]
Tides & Solunars
26° 2' 14" N
(26.0371)
81° 49' 58" W
(-81.83282)
Keewaydin 3 Mile C And D Reef 01 Rubble And Culverts County Funded
Depth (in feet): 28
Relief (in feet): 10
Date of Deployment: June 19 2003
Primary Material: CONCREETE SLABS (100)
Tonnage: 612
County: COLLIER [1]
Tides & Solunars
26° 2' 5" N
(26.03483)
81° 49' 51" W
(-81.83083)
Keewaydin 3 Mile C And D Reef 02 Rubble And Culverts County Funded
Depth (in feet): 28
Relief (in feet): 10
Date of Deployment: June 24 2003
Primary Material: CONCRETE RUBBLE (150)
Tonnage: 632
County: COLLIER [1]
Tides & Solunars
26° 2' 11" N
(26.0364)
81° 49' 52" W
(-81.83098)
Lee-Collier Lee-Collierbusses10/87Dgps
Depth (in feet): 35
Relief (in feet): 0
Date of Deployment: October 31 1987
Primary Material: STEEL BUSES
Tonnage: 0
County: LEE [1]
Tides & Solunars
26° 17' 26" N
(26.2905)
81° 55' 3" W
(-81.9175)
Marco 12 Mile Site M12a 1 Of 6 Drops This Grant 1 Of 2 This Date
Depth (in feet): 45
Relief (in feet): 8
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES
Tonnage: 417.8
County: COLLIER [1]
Tides & Solunars
25° 54' 35" N
(25.9098)
81° 59' 9" W
(-81.98588)
Marco 12 Mile Site M12b 4 Of 6 Drops This Grant 2 Of 4 This Date
Depth (in feet): 45
Relief (in feet): 10
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 142.8
County: COLLIER [1]
Tides & Solunars
25° 54' 40" N
(25.91123)
81° 59' 12" W
(-81.98663)
Marco 12 Mile Site M12c 3 Of 6 Drops This Grant 1 Of 4 This Date
Depth (in feet): 45
Relief (in feet): 8
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (720)
Tonnage: 44.9
County: COLLIER [1]
Tides & Solunars
25° 54' 42" N
(25.91158)
81° 59' 2" W
(-81.98397)
Marco 12 Mile Site M12c 2 Of 6 Drops This Grant 2 Of 2 This Date
Depth (in feet): 45
Relief (in feet): 6
Date of Deployment: June 9 2003
Primary Material: CONCRETE RAILROAD TIES (180)
Tonnage: 81.6
County: COLLIER [1]
Tides & Solunars
25° 54' 42" N
(25.91163)
81° 59' 2" W
(-81.9839)
Marco 9 Mile M9b Richie Reef 5 Of 6 Drops This Grant 3 Of 4 This Date
Depth (in feet): 39
Relief (in feet): 10
Date of Deployment: June 14 2003
Primary Material: LIMESTONE BOULDERS (50)
Tonnage: 122.4
County: COLLIER [1]
Tides & Solunars
25° 52' 58" N
(25.88282)
81° 54' 12" W
(-81.9033)
Marco 9 Mile M9c 6 Of 6 Drops This Grant 4 Of 4 This Date
Depth (in feet): 39
Relief (in feet): 8
Date of Deployment: June 14 2003
Primary Material: CONCRETE CULVERTS AND BOXES (40)
Tonnage: 142.8
County: COLLIER [1]
Tides & Solunars
25° 52' 58" N
(25.88288)
81° 54' 3" W
(-81.90087)
Marco Island 12 Mile M12cd05 900 Tons Of Concrete Rubble
Depth (in feet): 46
Relief (in feet): 8
Date of Deployment: May 22 2005
Primary Material: CONCRETE RUBBLE
Tonnage: 900
County: COLLIER [1]
Tides & Solunars
25° 54' 32" N
(25.90877)
81° 59' 2" W
(-81.98395)
Marco Island 2 Mile Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 22
Relief (in feet): 5
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 26" N
(25.9239)
81° 46' 14" W
(-81.7706)
Marco Island 2 Mile Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 23
Relief (in feet): 5
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 27" N
(25.92415)
81° 46' 13" W
(-81.77022)
Marco Island 2 Mile Concrete Culverts Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 22
Relief (in feet): 5
Date of Deployment: May 30 1997
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 49" N
(25.93035)
81° 46' 58" W
(-81.78275)
Marco Island 2 Mile Reef Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 21
Relief (in feet): 3
Date of Deployment: December 31 1972
Primary Material: STEEL PIPE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 24" N
(25.92325)
81° 45' 46" W
(-81.76273)
Marco Island 2 Mile Reef Marco 2 Mile 1972Concrete Tires Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 21
Relief (in feet): 5
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 24" N
(25.92327)
81° 45' 47" W
(-81.76305)
Marco Island 2 Mile Reef Concrete Rubble And Tires No Buoy Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 23
Relief (in feet): 4
Date of Deployment: December 31 1972
Primary Material: CONCRETE RUBBLE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 55' 26" N
(25.9239)
81° 46' 14" W
(-81.7706)
Marco Island 5 Mile Reef Marco 5 Mile 1986 Dredge Pipe
Depth (in feet): 30
Relief (in feet): 4
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 47" N
(25.86293)
81° 47' 52" W
(-81.7978)
Marco Island 5 Mile Reef Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 31
Relief (in feet): 4
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 49" N
(25.8636)
81° 47' 39" W
(-81.79413)
Marco Island 5 Mile Reef Steel Barge Steel Pipe And Concrete Rubble
Depth (in feet): 30
Relief (in feet): 7
Date of Deployment: December 31 1986
Primary Material: BARGE STEEL
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 53" N
(25.86473)
81° 47' 58" W
(-81.79952)
Marco Island 5 Mile Reef Marco 5 Mile Dredge Pipe Pontoons1986
Depth (in feet): 30
Relief (in feet): 4
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 56" N
(25.86552)
81° 47' 52" W
(-81.79787)
Marco Island 5 Mile Reef Marco 5 Mile 1986 Dredge Pipe Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 31
Relief (in feet): 4
Date of Deployment: December 31 1986
Primary Material: STEEL PIPE
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 51' 56" N
(25.86552)
81° 47' 49" W
(-81.79698)
Marco Island 5 Mile Site Large Diameter Concrete Culverts
Depth (in feet): 32
Relief (in feet): 4
Date of Deployment: June 1 1999
Primary Material: CONCRETE CULVERTS
Tonnage: 200
County: COLLIER [1]
Tides & Solunars
25° 51' 54" N
(25.86493)
81° 47' 47" W
(-81.79647)
Marco Island 9 Mile-01 Concrete Bridge And Pilings ,15000 Funded By City Of Marco Is. (1 Of 2
Depth (in feet): 39
Relief (in feet): 5
Date of Deployment: June 5 2001
Primary Material: BRIDGE CONCRETE DECKING (11)
Tonnage: 212.7
County: COLLIER [1]
Tides & Solunars
25° 52' 51" N
(25.88073)
81° 54' 9" W
(-81.9024)
Marco Island 9 Mile-01 Concrete Bridge Pilings And Rubble ,15000 Funded By City Of Marco Is.
Depth (in feet): 39
Relief (in feet): 5
Date of Deployment: June 7 2001
Primary Material: BRIDGE CONCRETE DECKING (7)
Tonnage: 239.4
County: COLLIER [1]
Tides & Solunars
25° 52' 51" N
(25.88073)
81° 54' 9" W
(-81.9024)
Marco Pass Reef Site 6 Loads10/3-5-20/83 And 12/1-2-3/83 (Not Located 12/01)
Depth (in feet): 22
Relief (in feet): 0
Date of Deployment: December 30 1983
Primary Material: CONCRETE CULVERTS
Tonnage: 1435
County: COLLIER [1]
Tides & Solunars
25° 55' 24" N
(25.92333)
81° 46' 15" W
(-81.77083)
Memorial Reef Balls 1 Ultra 6 Reefballs And 8 Pallet Balls As Memorial Reef
Depth (in feet): 39
Relief (in feet): 5
Date of Deployment: August 6 2002
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 3.7
County: COLLIER [1]
Tides & Solunars
25° 52' 47" N
(25.87973)
81° 54' 5" W
(-81.90133)
Naples Pier Reef Widely Scattered Piles Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 22
Relief (in feet): 3
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 250
County: COLLIER [1]
Tides & Solunars
26° 7' 49" N
(26.13025)
81° 50' 42" W
(-81.84505)
Naples Pier Reef Large Pile Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 25
Relief (in feet): 6
Date of Deployment: June 17 1995
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 8' 2" N
(26.13377)
81° 50' 39" W
(-81.8441)
Pavilion Key 6 Mile Reef Barge And Concrete Rubble Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 17
Relief (in feet): 8
Date of Deployment:
Primary Material: BARGE STEEL
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 40' 58" N
(25.6827)
81° 27' 49" W
(-81.4635)
Pavilion Key 6 Mile Reef Concrete Culverts And Rubble From Docks
Depth (in feet): 16
Relief (in feet): 0
Date of Deployment: December 31 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 41' 11" N
(25.68633)
81° 28' 0" W
(-81.46667)
Pavilion Key 6 Mile Reef Lowered By Crane To The Bottom (Not Located 12/01)
Depth (in feet): 18
Relief (in feet): 0
Date of Deployment: April 28 1989
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
25° 41' 18" N
(25.68833)
81° 28' 0" W
(-81.46667)
Rock Reef 1 About 130 Pieces Of 3 Ft. Limestone Boulders 1 Of 4 Drops This Grant
Depth (in feet): 24
Relief (in feet): 10
Date of Deployment: June 4 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER [1]
Tides & Solunars
26° 18' 25" N
(26.30687)
81° 52' 27" W
(-81.87427)
Rock Reef 2 About 130 Pieces Of 3 Ft. Limestone Boulders 2 Of 4 Drops This Grant
Depth (in feet): 24
Relief (in feet): 5
Date of Deployment: June 9 2004
Primary Material: ROCK LIMESTONE (130)
Tonnage: 270
County: COLLIER [1]
Tides & Solunars
26° 18' 17" N
(26.30477)
81° 52' 23" W
(-81.87293)
Rock Reef 3 About 65 Pieces Of 3 Ft. Limestone Boulders 3 Of 4 Drops This Grant
Depth (in feet): 24
Relief (in feet): 10
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER [1]
Tides & Solunars
26° 18' 27" N
(26.30753)
81° 52' 23" W
(-81.87295)
Rock Reef 4 About 65 Pieces Of 3 Ft. Limestone Boulders 4 Of 4 Drops This Grant
Depth (in feet): 24
Relief (in feet): 10
Date of Deployment: June 14 2004
Primary Material: ROCK LIMESTONE (65)
Tonnage: 135
County: COLLIER [1]
Tides & Solunars
26° 18' 20" N
(26.30543)
81° 52' 17" W
(-81.87143)
Santa Lucia 81 Ton Cement Boat Called The Santa Lucia
Depth (in feet): 24
Relief (in feet): 0
Date of Deployment: April 30 1997
Primary Material: SHIP CEMENT
Tonnage: 81
County: COLLIER [1]
Tides & Solunars
26° 5' 23" N
(26.0898)
81° 50' 38" W
(-81.84377)
Wiggins Pass 14 Mile Reef Concrete Culverts And Rubble (Not Located 12/01)
Depth (in feet): 48
Relief (in feet): 0
Date of Deployment: December 31 1991
Primary Material: CONCRETE CULVERTS
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 14' 52" N
(26.24767)
82° 5' 50" W
(-82.09717)
Wiggins Pass 3 Mile C And D Rubble And Culverts County Funded-,29379.00
Depth (in feet): 27
Relief (in feet): 10
Date of Deployment: October 1 2003
Primary Material: CONCRETE RUBBLE (600)
Tonnage: 652.8
County: COLLIER [1]
Tides & Solunars
26° 18' 19" N
(26.3054)
81° 52' 26" W
(-81.87377)
Wiggins Pass 4.5 Mile Reef Steel Barge And Crane
Depth (in feet): 31
Relief (in feet): 5
Date of Deployment: February 4 1987
Primary Material: BARGE STEEL
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 17' 28" N
(26.29115)
81° 55' 10" W
(-81.91942)
Wiggins Pass 5 Mile School Buses Coke And Other Soft Drink Trucks.
Depth (in feet): 30
Relief (in feet): 5
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 17' 28" N
(26.29123)
81° 55' 48" W
(-81.93013)
Wiggins Pass 5 Mile School Buses Soft Drink Trucks Confirmed By Rbf Grant Fwcc-01002
Depth (in feet): 30
Relief (in feet): 5
Date of Deployment: September 1 1986
Primary Material: STEEL SCHOOL BUSES
Tonnage: 0
County: COLLIER [1]
Tides & Solunars
26° 17' 29" N
(26.29127)
81° 55' 49" W
(-81.93018)
Wiggins Pass 9 Mile 800 Tons Of Concrete Culverts (Not Located 12/01)
Depth (in feet): 42
Relief (in feet): 0
Date of Deployment: May 4 1993
Primary Material: CONCRETE CULVERTS
Tonnage: 800
County: COLLIER [1]
Tides & Solunars
26° 14' 1" N
(26.2335)
82° 7' 44" W
(-82.12893)