Santa Rosa County GPS Coordinates for Fishing

State: Florida

The locations below are primarily artificial reefs and shipwrecks. Click on a location on the map to see its description and coordinates, or scroll down to the list to see all the details. A GPX file download is provided at the bottom of the page if you'd like to import all the locations. Note that they may also include locations from nearby areas. into your GPS. You can also see the tide, solunar, and best fishing time predictions by clicking on the Tides & Solunars button at each location.

If you have any feedback, or want to suggest any additional sites, please feel free to Contact Us.

Waypoint Map

Waypoint Name Description Latitude Longitude
Admiral Fetterman Reef 15 Superball Reefballs Around 100 Tons Of Rock 2 Of 2 Drops This Gra
Depth (in feet): 93
Relief (in feet): 5
Date of Deployment: June 1 2006
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 136
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 41" N
(30.07803)
87° 11' 53" W
(-87.19797)
Antares' Ship 387 Foot Freighter - Antares
Depth (in feet): 130
Relief (in feet): 60
Date of Deployment: September 27 1995
Primary Material: SHIP STEEL 387’
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
30° 0' 28" N
(30.00788)
87° 7' 50" W
(-87.13067)
Bay Bridge #1 480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Depth (in feet): 100
Relief (in feet): 0
Date of Deployment: January 19 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 480
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 53" N
(30.098)
87° 9' 3" W
(-87.15083)
Bay Bridge #2 500 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Depth (in feet): 100
Relief (in feet): 0
Date of Deployment: February 1 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 500
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 54" N
(30.09833)
87° 9' 0" W
(-87.15)
Bay Bridge #3 480 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Depth (in feet): 100
Relief (in feet): 0
Date of Deployment: February 20 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 480
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 54" N
(30.09833)
87° 9' 0" W
(-87.15)
Bay Bridge #4 460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Depth (in feet): 100
Relief (in feet): 0
Date of Deployment: March 6 2006
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 460
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 54" N
(30.09833)
87° 9' 0" W
(-87.15)
Brown Barge Middle School 1 Goliath Ball And 4 Pallet Balls
Depth (in feet): 91
Relief (in feet): 5
Date of Deployment: June 2 2004
Primary Material: MODULES CONCRETE REEFBALLS (5)
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 31" N
(30.10853)
87° 11' 38" W
(-87.19397)
Celia Reef 15 Walter Florida Special Modules 1 Of 2 Drops This Day And Grant
Depth (in feet): 92
Relief (in feet): 10
Date of Deployment: June 14 2003
Primary Material: MODULES CONCRETE WALTERS FL (15)
Tonnage: 30
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 14" N
(30.08725)
87° 11' 54" W
(-87.19825)
Chevron Platform Oil Rig Structure Two Jackets Laying Side By Side
Depth (in feet): 137
Relief (in feet): 62
Date of Deployment: October 18 1993
Primary Material: OIL RIG STRUCTURE
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 15" N
(30.07073)
87° 2' 7" W
(-87.0353)
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (2 Of 3)
Depth (in feet): 96
Relief (in feet): 6
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 50" N
(30.09718)
87° 8' 9" W
(-87.13582)
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (3 Of 3)
Depth (in feet): 96
Relief (in feet): 6
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 55" N
(30.0986)
87° 7' 57" W
(-87.1325)
Concrete ' Fish Havens' Center For 53 Fish Havens (35-Fht And 18-Fh)
Depth (in feet): 95
Relief (in feet): 6
Date of Deployment: June 26 1999
Primary Material: MODULES CONCRETE FISH HAVENS(53)
Tonnage: 81
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 59" N
(30.09977)
87° 7' 57" W
(-87.1325)
Concrete ' Fish Havens' Fish Haven Modules 6 Tower 11 Fh And 4 Juniors (1 Of 3)
Depth (in feet): 95
Relief (in feet): 6
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (21)
Tonnage: 24.2
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 15" N
(30.10428)
87° 7' 58" W
(-87.13273)
Concrete Pyramids 4 Sets Of 5 Pyramids Each (20 Total) In Line To (13309.0/47003.0)
Depth (in feet): 18
Relief (in feet): 7
Date of Deployment: April 29 1994
Primary Material: MODULES CONCRETE GHETTOS (20)
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 15" N
(30.07078)
87° 1' 48" W
(-87.0299)
Don Phillips Barge And Parks Steel Deck Barge 120 X 33 X 7 And Steel And Concrete Merry-Go-Rounds
Depth (in feet): 100
Relief (in feet): 8
Date of Deployment: January 9 2005
Primary Material: BARGE STEEL 120’
Tonnage: 446
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 45" N
(30.09583)
87° 10' 36" W
(-87.17667)
East Lap 'Army Tanks' Reef Ex Tank #9 -Pensacola
Depth (in feet): 105
Relief (in feet): 10
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 30" N
(30.10845)
87° 11' 60" W
(-87.19995)
East Lap 'Army Tanks' Reef Ex Tank #10-Pensacola
Depth (in feet): 105
Relief (in feet): 10
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 30" N
(30.10845)
87° 11' 60" W
(-87.19995)
East Lap 'Army Tanks' Reef Ex Tank #11- Pensacola
Depth (in feet): 105
Relief (in feet): 10
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 30" N
(30.10847)
87° 11' 59" W
(-87.19962)
East Lap 'Army Tanks' Reef Ex Tank #12-Pensacola
Depth (in feet): 105
Relief (in feet): 10
Date of Deployment: December 18 1994
Primary Material: ARMY TANKS M-60
Tonnage: 50
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 30" N
(30.10847)
87° 11' 57" W
(-87.19928)
East Lap 'Army Tanks' Reef Ex Tank #13-Pensacola
Depth (in feet): 105
Relief (in feet): 10
Date of Deployment: December 18 1994
Primary Material: ARMY TANK M-60
Tonnage: 50
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 34" N
(30.10943)
87° 11' 53" W
(-87.19793)
East Lap 'Chemical Courier' 80 Ft X 25 Ft. Wide X 38 Ft. Tall Tug The Chemical Courier
Depth (in feet): 95
Relief (in feet): 35
Date of Deployment: October 24 1996
Primary Material: SHIP STEEL TUG 80’
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 5' 57" N
(30.09917)
87° 10' 57" W
(-87.1825)
East Lap Reefballs 5Th Of Five Loads 5 Each Also At 13288.5/47044.9 And 13288.1/47045.0
Depth (in feet): 94
Relief (in feet): 5
Date of Deployment: June 27 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 5' 43" N
(30.09517)
87° 9' 32" W
(-87.159)
East Lap Reefballs 4Th Of Five Loads 5 Each Also At 13285.1/47048.4 And 13286.4/47048.4
Depth (in feet): 94
Relief (in feet): 5
Date of Deployment: June 26 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 5' 56" N
(30.09897)
87° 10' 3" W
(-87.16753)
East Lap Reefballs 3Rd Of Five Loads 5 Each Also At 13286.1/47050.8 And 13286.8/47050.8
Depth (in feet): 94
Relief (in feet): 5
Date of Deployment: June 25 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 6' 24" N
(30.10667)
87° 10' 4" W
(-87.16783)
East Lap Reefballs 1 1St Of Five Loads15 Balls-5 Each @ 13270.6/47049.8& 13270.3/47049.7
Depth (in feet): 94
Relief (in feet): 5
Date of Deployment: June 19 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 6' 41" N
(30.11133)
87° 11' 25" W
(-87.19017)
East Lap Reefballs 2Nd Of Five Loads 5 Each Also At 13270.4/47049.5 And 13285.6/47050.9
Depth (in feet): 94
Relief (in feet): 5
Date of Deployment: June 20 1996
Primary Material: MODULES CONCRETE REEFBALLS(15)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 6' 49" N
(30.11367)
87° 10' 5" W
(-87.168)
George Wilkins Reef 19 Goliath Reefballs 1 Of 2 Drops This Grant
Depth (in feet): 90
Relief (in feet): 5
Date of Deployment: June 24 2005
Primary Material: MODULES CONCRETE REEFBALLS (19)
Tonnage: 57
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 25" N
(30.09017)
87° 10' 51" W
(-87.18093)
I-10 Bridge Reef 2 I-10 22 Pieces Bridge Pilings 4’X4’x30’ (Mpr) Second Of 3 Loads
Depth (in feet): 128
Relief (in feet): 8
Date of Deployment: May 8 1997
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 800
County: ESCAMBIA [1]
Tides & Solunars
30° 0' 31" N
(30.00865)
87° 7' 46" W
(-87.12957)
J. Brown-Liberty Ship 440 Foot Liberty Ship The Joseph E. Brown
Depth (in feet): 85
Relief (in feet): 15
Date of Deployment: December 31 1980
Primary Material: SHIP STEEL
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 12' 47" N
(30.21305)
86° 48' 21" W
(-86.80583)
Knicklebine Barge Steel Barge And 14 Pieces Of Concrete Ballast
Depth (in feet): 122
Relief (in feet): 11
Date of Deployment: February 12 2003
Primary Material: BARGE STEEL 117’
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
30° 1' 58" N
(30.03283)
87° 11' 30" W
(-87.19158)
Mara 16 Walter Florida Special Modules 2 Of 2 Drops This Day And Grant
Depth (in feet): 95
Relief (in feet): 10
Date of Deployment: June 14 2003
Primary Material: MODULES CONCRETE WALTERS FL (16)
Tonnage: 32
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 28" N
(30.09108)
87° 11' 51" W
(-87.1975)
Mayor Whibbs Reef 18 Superball Reefballs 1 Of 2 Drops This Grant
Depth (in feet): 90
Relief (in feet): 5
Date of Deployment: June 1 2006
Primary Material: MODULES CONCRETE REEFBALLS (18)
Tonnage: 36
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 38" N
(30.07728)
87° 11' 38" W
(-87.19388)
Mc Kay Reef Tires Appliances And Shopping Carts
Depth (in feet): 156
Relief (in feet): 0
Date of Deployment: December 31 1987
Primary Material: TIRES
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 0" N
(30.06667)
87° 4' 0" W
(-87.06667)
Navy Dive Tender Ydt-14 132 Feet Long 312 Tons Navy Dive Tender (1 1St Of Two This Date)
Depth (in feet): 90
Relief (in feet): 28
Date of Deployment: April 1 2000
Primary Material: SHIP STEEL 132’
Tonnage: 312
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 20" N
(30.08883)
87° 9' 38" W
(-87.16067)
Navy Dive Tender Ydt-15 132 Feet Long 312 Tons Navy Dive Tender (2Nd Of Two This Date)
Depth (in feet): 90
Relief (in feet): 28
Date of Deployment: April 1 2000
Primary Material: SHIP STEEL 132’
Tonnage: 312
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 16" N
(30.08778)
87° 9' 33" W
(-87.15917)
Okaloosa County Lap Site C 3Nd Of 3 Deployments (C) This Grant 2 Nd Of 2 This Date
Depth (in feet): 134
Relief (in feet): 6
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (18)
Tonnage: 23.2
County: OKALOOSA [1]
Tides & Solunars
30° 8' 18" N
(30.13847)
86° 48' 58" W
(-86.81598)
Okaloosa County Lap Site C 1Rst Of 3 Deployments (A) This Grant One This Date
Depth (in feet): 134
Relief (in feet): 6
Date of Deployment: June 15 2000
Primary Material: MODULES CONCRETE FISH HAVENS (18)
Tonnage: 23.2
County: OKALOOSA [1]
Tides & Solunars
30° 8' 22" N
(30.13958)
86° 49' 4" W
(-86.81773)
Okaloosa County Lap Site C 2Nd Of 3 Deployments (B) This Grant 1 1St Of 2 This Date
Depth (in feet): 134
Relief (in feet): 6
Date of Deployment: June 20 2000
Primary Material: MODULES CONCRETE FISH HAVENS (18)
Tonnage: 23.2
County: OKALOOSA [1]
Tides & Solunars
30° 8' 23" N
(30.13968)
86° 48' 58" W
(-86.81613)
Okaloosa County Lap Site C 2Nd Of 2 Deployments This Grant Two Dates And Locations
Depth (in feet): 134
Relief (in feet): 6
Date of Deployment: June 15 2000
Primary Material: MODULES CONCRETE FISH HAVENS (27)
Tonnage: 37.5
County: OKALOOSA [1]
Tides & Solunars
30° 8' 31" N
(30.14188)
86° 49' 8" W
(-86.81883)
Oriskany Memorial Reef Navy Aircraft Carrier Ex-Uss Oriskany 888 Feet Long 135 Feet Deep To
Depth (in feet): 212
Relief (in feet): 134
Date of Deployment: May 17 2006
Primary Material: SHIP STEEL 888’
Tonnage: 32000
County: ESCAMBIA [1]
Tides & Solunars
30° 2' 33" N
(30.04258)
87° 0' 24" W
(-87.00661)
Pat Donnelly Reef 27 Goliath Reefballs Two Of Two Drops This Grant
Depth (in feet): 90
Relief (in feet): 5
Date of Deployment: June 28 2004
Primary Material: MODULES CONCRETE REEFBALLS (27)
Tonnage: 54
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 41" N
(30.0781)
87° 11' 9" W
(-87.1857)
Penhall Ii Reef Blackwater Brdige Rubble 6 Loads Total
Depth (in feet): 94
Relief (in feet): 10
Date of Deployment: June 28 2003
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 4500
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 60" N
(30.08333)
87° 10' 60" W
(-87.18333)
Penhall Reef Blackwater Brdige Rubble 4 Loads Total
Depth (in feet): 92
Relief (in feet): 12
Date of Deployment: February 9 2002
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 5700
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 31" N
(30.09205)
87° 11' 30" W
(-87.19162)
Pensacoal Bay Fishing Bridge Reef # 460 Tons Of Concrete Bridge Spans From Old Pensacola Bay Fishing Pier
Depth (in feet): 113
Relief (in feet): 5
Date of Deployment: February 17 2007
Primary Material: BRIDGE RUBBLE CONCRETE
Tonnage: 500
County: ESCAMBIA [1]
Tides & Solunars
30° 6' 43" N
(30.11205)
87° 9' 40" W
(-87.16122)
Ray Jones Reef 15 Goliath Reefballs And 100 Tons Rubble In Middle 1 Of 2 Drops This
Depth (in feet): 90
Relief (in feet): 5
Date of Deployment: June 24 2005
Primary Material: MODULES CONCRETE REEFBALLS (15)
Tonnage: 153
County: ESCAMBIA [1]
Tides & Solunars
30° 5' 22" N
(30.08933)
87° 10' 32" W
(-87.1755)
Rusty B Reef 30 Goliath Reefballs And 40 Tons Of Rock One Of Two Drops This Grant
Depth (in feet): 89
Relief (in feet): 5
Date of Deployment: June 22 2004
Primary Material: MODULES CONCRETE REEFBALLS (20)
Tonnage: 140
County: ESCAMBIA [1]
Tides & Solunars
30° 4' 45" N
(30.07927)
87° 11' 22" W
(-87.1895)
Santa Rosa Marine Resort 4 Towers 30 Havens And 30 Juniors 5 Sites
Depth (in feet): 97
Relief (in feet): 6
Date of Deployment: June 2 2003
Primary Material: CONCRETE MODULES FISH HAVENS (64)
Tonnage: 50
County: SANTA ROSA [1]
Tides & Solunars
30° 3' 27" N
(30.05753)
87° 11' 56" W
(-87.19888)
Santa Rosa Marine Resort Ii 30 Goliath Reef Balls First Of Two Drops This Grant
Depth (in feet): 85
Relief (in feet): 5
Date of Deployment: June 30 2004
Primary Material: MODULES CONCRETE REEFBALLS(36)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 54" N
(30.08165)
87° 11' 41" W
(-87.19472)
Santa Rosa Marine Resort Ii 30 Goliath Reef Balls Two Of Two Drops This Grant
Depth (in feet): 85
Relief (in feet): 5
Date of Deployment: July 12 2004
Primary Material: MODULES CONCRETE REEFBALLS(35)
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 54" N
(30.08167)
87° 11' 42" W
(-87.195)
Santa Rosa Marine Resort Iii 5 Towers 25 Havens And 25 Juniors At 13 Sites Site 3-1 Is Center
Depth (in feet): 85
Relief (in feet): 6
Date of Deployment: June 30 2005
Primary Material: CONCRETE MODULES FISH HAVENS (55)
Tonnage: 62.5
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 56" N
(30.08225)
87° 10' 25" W
(-87.17372)
Santa Rosa Marine Resort Iv-#1 15 Walters Coquina Sides Reefs 12 X 10 Around Center
Depth (in feet): 85
Relief (in feet): 10
Date of Deployment: May 24 2006
Primary Material: WALTER COQUINA REEFS (15)
Tonnage: 37.5
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 30" N
(30.0749)
87° 11' 14" W
(-87.18712)
Santa Rosa Marine Resort Iv-#2 15 Walters Coquina Sides Reefs 12 X 10 Around Center
Depth (in feet): 85
Relief (in feet): 10
Date of Deployment: May 24 2006
Primary Material: WALTER COQUINA REEFS (15)
Tonnage: 37.5
County: SANTA ROSA [1]
Tides & Solunars
30° 4' 34" N
(30.076)
87° 11' 26" W
(-87.1906)
Tank Turrets M-60 Steel Tank Turrets Average Of 7 Coordinates
Depth (in feet): 0
Relief (in feet): 0
Date of Deployment: May 21 1998
Primary Material: STEEL TANK TURRETS
Tonnage: 0
County: OKALOOSA [1]
Tides & Solunars
30° 9' 24" N
(30.15673)
86° 49' 5" W
(-86.81793)
Tenneco Platform Oil Rig Platform2 Pieces 130’X 80 X 90’
Depth (in feet): 175
Relief (in feet): 80
Date of Deployment: September 29 1982
Primary Material: OIL RIG STRUCTURE
Tonnage: 0
County: ESCAMBIA [1]
Tides & Solunars
29° 59' 44" N
(29.99555)
87° 5' 7" W
(-87.08518)
Valparaiso 6-A 2Nd Of 3 Deployments This Grant Same Date And 3 Locations All 4’D X 7
Depth (in feet): 130
Relief (in feet): 4
Date of Deployment: June 12 2000
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 120
County: OKALOOSA [1]
Tides & Solunars
30° 8' 33" N
(30.1425)
86° 48' 58" W
(-86.81625)
Valparaiso 6-B 3 Rd Of 3 Deployments This Grant Same Date And 3 Locations All 4’D X
Depth (in feet): 133
Relief (in feet): 4
Date of Deployment: June 12 2000
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 120
County: OKALOOSA [1]
Tides & Solunars
30° 8' 29" N
(30.1415)
86° 49' 3" W
(-86.81743)
Valparaiso 6-C 1Rst Of 3 Deployments This Grant Same Date And 3 Locations All 4’D X
Depth (in feet): 131
Relief (in feet): 4
Date of Deployment: June 12 2000
Primary Material: CONCRETE CULVERTS (30)
Tonnage: 120
County: OKALOOSA [1]
Tides & Solunars
30° 8' 34" N
(30.14282)
86° 48' 57" W
(-86.8158)
Woodburn Reef Truck Cabs
Depth (in feet): 138
Relief (in feet): 0
Date of Deployment: December 31 1987
Primary Material: STEEL TRUCK CABS
Tonnage: 0
County: SANTA ROSA [1]
Tides & Solunars
29° 19' 60" N
(29.33333)
87° 4' 0" W
(-87.06667)