Buckeye Reef Addition-02
25 Fh Towers + 25 Fh Modules 13 Patch Reefs
Date of Deployment: June 26 2002
Primary Material: MODULES CONCRETE FISH HAVENS (50)
Tonnage: 40
County: TAYLOR
Buckeye Reef
56 Pieces Of Large Scrap Steel From Buckeye Paper Mill
Date of Deployment: June 29 1996
Primary Material: STEEL SCRAP
Tonnage: 60
County: TAYLOR
Steinhatchee Reef - Site 2
Scrap Metal And Concrete Rubble
Date of Deployment: December 31 1965
Primary Material: STEEL SCRAP
County: TAYLOR
Steinhatchee Reef - Site 3
118 Cubes In An L-Shape Lat/Long Are For South Corner
Date of Deployment: June 27 1998
Primary Material: MODULES CONCRETE CUBES (112)
Tonnage: 147
County: TAYLOR
Steinhatchee Reef - Site 4
Concrete Culverts-Mixed Metal-Boiler Parts.
Date of Deployment: June 24 1992
Primary Material: CONCRETE CULVERTS
County: TAYLOR
Steinhatchee Reef - Site 5
Concrete Culverts And Mixed Metal.
Date of Deployment: May 11 1993
Primary Material: CONCRETE CULVERTS
County: TAYLOR
Steinhatchee Reef - Site 1
Steel Scrap And Steel Boiler Parts.
Date of Deployment: April 16 1990
Primary Material: STEEL SCRAP
County: TAYLOR
Birdrack #3
Culverts Placed Circularly Around Birdrack.
Date of Deployment: May 12 1993
Primary Material: CONCRETE CULVERTS
County: TAYLOR
Andree Reef #2
96 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: July 27 1995
Primary Material: MODULES CONCRETE CUBES (96)
Tonnage: 120
County: TAYLOR
Andree Reef #1
24 Pre-Fabricated Cubes One Meter On A Side-50M Spaced Hexagon
Date of Deployment: July 27 1995
Primary Material: MODULES CONCRETE CUBES (24)
Tonnage: 30
County: TAYLOR
Birdrack #2
Culverts Placed Circularly Around Birdrack.
Date of Deployment: May 18 1993
Primary Material: CONCRETE CULVERTS
County: TAYLOR
Birdrack #1
Culverts Placed Circularly Around Birdrack.
Date of Deployment: May 17 1993
Primary Material: CONCRETE CULVERTS
County: TAYLOR